Highlights

  • Bailey Bridge at Limchigad completed, traffic resumes

  • Route enables relief supply to Dharali village

  • BRO builds 100-foot bridge in three days

Latest news

Future Netwings Solution Enhances Service Delivery with the Business Continuity Policy

Future Netwings Solution Enhances Service Delivery with the Business Continuity Policy

India-UK trade deal likely by May 1; Europe deal expected by year-end

India-UK trade deal likely by May 1; Europe deal expected by year-end

VerSe Innovation Appoints Prasanna Prasad as Chief Product and Technology Officer to Accelerate AI-Led Product and Platform Innovation

VerSe Innovation Appoints Prasanna Prasad as Chief Product and Technology Officer to Accelerate AI-Led Product and Platform Innovation

Changing Aspirations of Premium Homebuyers in NCR

Changing Aspirations of Premium Homebuyers in NCR

Airfloa Rail Technology's FY26 Business Update and Strategic Direction

Airfloa Rail Technology's FY26 Business Update and Strategic Direction

Sanjay Khanna Appointed as Chairman & Managing Director of BPCL

Sanjay Khanna Appointed as Chairman & Managing Director of BPCL

Galgotias University Placement Report: 4700+ Offers Across Top Recruiters in 2026

Galgotias University Placement Report: 4700+ Offers Across Top Recruiters in 2026

"Be the same loving brother you are to me...": Sanjay Dutt pens heartfelt birthday note for Anant Ambani

"Be the same loving brother you are to me...": Sanjay Dutt pens heartfelt birthday note for Anant Ambani

Construction of Bailey Bridge at Limchigad completed: Uttarakhand CM Dhami

The cloudburst led to flash floods in the high-altitude villages of Dharali. Several houses were reported to have been swept away. 

Construction of Bailey Bridge at Limchigad completed: Uttarakhand CM Dhami

The construction of Bailey Bridge at Limchigad has been completed and is now open for public use, Uttarakhand Chief Minister Pushkar Singh Dhami announced on Monday.

The relief materials for the flash-flood-affected Dharali are also being sent through this route. In a post on X, Uttarakhand CM said, "The construction work of the Bailey Bridge at Limchigad has been completed, and the bridge has been opened for traffic. Now, through this bridge, not only are relief materials and machinery being sent forward quickly, but the movement of local people has also resumed smoothly. In this difficult time of disaster, our government is working with full commitment to normalise public life."


<blockquote class="twitter-tweet"><p lang="hi" dir="ltr">लिमचीगाड के बेली ब्रिज का निर्माण कार्य पूर्ण हो चुका है और पुल आवागमन के लिए खोल दिया गया है। अब इस पुल के माध्यम से न केवल राहत सामग्री और मशीनरी तेजी से आगे भेजी जा रही है, बल्कि स्थानीय लोगों की आवाजाही भी फिर से सुचारु हो गई है। आपदा के इस कठिन समय में हमारी सरकार जनजीवन को… <a href="https://t.co/v8RMo1dB1D">pic.twitter.com/v8RMo1dB1D</a></p>&mdash; Pushkar Singh Dhami (@pushkardhami) <a href="https://twitter.com/pushkardhami/status/1954758674679021712?ref_src=twsrc%5Etfw">August 11, 2025</a></blockquote> <script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>


Earlier, Border Roads Organisation (BRO) officials also confirmed the same. The Bailey bridge replaces the Limchi Gad Bridge in the Gangnani area on the Gangotri National Highway, damaged in the aftermath of the cloudburst in Dharali village near Gangotri.

In a post on X, BRO said, "When the Limchi Gad Bridge on NH-34 was washed away in a devastating cloudburst, the lifeline to Harsil was severed. In mission mode and through the long hours of darkness, @BROindia teams braved treacherous terrain, rushing men and machinery to the site. Against the odds, the new 100' long Bailey bridge has been launched under challenging conditions -- swiftly restoring this vital link. A true testament to @BROindia relentless spirit and resolute action -- keeping the nation moving, come what may."


By working on a war footing and building the bridge in a short period of three days, the road on the Gangotri route has now become smooth till Sonagad and this has also paved the way for rapid reconstruction of the damaged road ahead. After the disaster, Uttarakhand Chief Minister Pushkar Singh Dhami reached the spot immediately and gave instructions to conduct relief and rescue and reconstruction works on a war footing. The Chief Minister is constantly reviewing the progress of these works.


Under the supervision and direction of the Chief Minister, rescue and relief operations are being conducted with better coordination and full speed by many departments and agencies of the state and central government. A massive mudslide struck Dharali village in the Kheer Gad area near Harsil, triggering a sudden flow of debris and water through the settlements on August 5.


The cloudburst led to flash floods in the high-altitude villages of Dharali. Several houses were reported to have been swept away.

ADVERTISEMENT

Up Next

Construction of Bailey Bridge at Limchigad completed: Uttarakhand CM Dhami

Construction of Bailey Bridge at Limchigad completed: Uttarakhand CM Dhami

Uttarakhand has potential to be country's 'natural healing destination': CM Dhami

Uttarakhand has potential to be country's 'natural healing destination': CM Dhami

Uttarakhand: 88 injured in loco train collision in hydropower project tunnel in Chamoli

Uttarakhand: 88 injured in loco train collision in hydropower project tunnel in Chamoli

Uttarakhand: Seven killed, 12 injured as bus falls into gorge in Almora

Uttarakhand: Seven killed, 12 injured as bus falls into gorge in Almora

Uttarakhand begins pre-revision exercise to verify voters from 2003 rolls

Uttarakhand begins pre-revision exercise to verify voters from 2003 rolls

Uttarakhand govt to form panel for revival, development of Sanskrit: Dhami

Uttarakhand govt to form panel for revival, development of Sanskrit: Dhami

ADVERTISEMENT

editorji-whatsApp

More videos

Uttarakhand: Cabinet increases relief amount for disaster losses in Dharali, other areas

Uttarakhand: Cabinet increases relief amount for disaster losses in Dharali, other areas

Shri Kedarnath Dham closes for winter; Lord Kedar’s palanquin moves to Ukhimath

Shri Kedarnath Dham closes for winter; Lord Kedar’s palanquin moves to Ukhimath

Will recommend CBI probe into alleged paper leak: Uttarakhand CM Dhami

Will recommend CBI probe into alleged paper leak: Uttarakhand CM Dhami

Uttarakhand Achieves Historic Revenue Surplus, Confirmed by CAG Report

Uttarakhand Achieves Historic Revenue Surplus, Confirmed by CAG Report

Uttarakhand: 2 killed, 6 missing, 5 rescued alive after landslides, flooding hit Chamoli villages

Uttarakhand: 2 killed, 6 missing, 5 rescued alive after landslides, flooding hit Chamoli villages

Uttarakhand: 10 missing after landslide, flooding in Chamoli villages

Uttarakhand: 10 missing after landslide, flooding in Chamoli villages

Early restoration of damaged roads, power lines priority: Uttarakhand CM Dhami

Early restoration of damaged roads, power lines priority: Uttarakhand CM Dhami

Heavy overnight rain wreaks havoc in Dehradun, neighbouring areas; five swept away

Heavy overnight rain wreaks havoc in Dehradun, neighbouring areas; five swept away

Landslide blocks rail route in Haridwar, movement of trains affected

Landslide blocks rail route in Haridwar, movement of trains affected

Uttarakhand CM Dhami approves dearness allowance hike, key development projects

Uttarakhand CM Dhami approves dearness allowance hike, key development projects

Editorji Technologies Pvt. Ltd. © 2022 All Rights Reserved.